Zhengzhou Electronic Information Industrial Park Wastewater Treatment Project
Project Overview
A large-scale industrial wastewater treatment project serving an electronic-information industrial park of approximately 67,000 m². The park covers chip design, manufacturing, packaging and testing, applications and platform services, while the wastewater station is designed for 30,000 m³/d and mainly treats mixed PCB-industry wastewater.
Influent → Equalization Tank & Pump Station → Coagulation Sedimentation → Hydrolysis Acidification → Membrane Screen → Modified A2O (MBR) → Denitrification Filter → Transition Tank → Ozone Catalytic Oxidation Tower → V-type Filter → Discharge Tank → Compliant Discharge
Wastewater Characteristics & Project Conditions
- Mixed wastewater from PCB-related production
- Complex industrial wastewater requiring multi-stage physical, biological and advanced treatment
- Stable final-discharge performance required for a large electronic-information industrial park
Treatment Targets
- Treat 30,000 m³/d of mixed industrial wastewater reliably
- Combine pretreatment, biological treatment, membrane treatment and advanced oxidation
- Deliver stable effluent for compliant discharge
Engineering Highlights
- Large electronic-information industrial park reference in Zhengzhou
- Treatment route integrates MBR, denitrification and ozone catalytic oxidation
- Demonstrates multi-stage treatment for complex PCB-industry mixed wastewater
