← BACK TO WASTEWATER PROJECTS

Landfill Leachate Project

Treatment projects for high-strength landfill leachate with demanding COD, ammonia nitrogen and membrane-separation requirements.

Landfill leachate treatment for complex, high-strength wastewater.

The Ningling project is presented as one complete engineering reference using the client-supplied project description, aerial site photography and site video. The page focuses on the confirmed treatment scale, leachate characteristics and discharge requirement without adding unsupported process details.

Ningling Landfill Leachate Treatment Project

TREATMENT CAPACITY 150 t/d

Project Overview

A landfill-leachate treatment project serving a county-level municipal solid-waste landfill in Shangqiu. The leachate is a complex, high-concentration organic wastewater with high pollutant loading, large fluctuations in water quality and flow, high ammonia nitrogen, imbalanced nutrient ratios, heavy metals and toxic substances. Its water-quality characteristics also change significantly as the landfill ages.

TREATMENT / DISCHARGE REQUIREMENT

150 t/d treatment capacity · Effluent after treatment meets Table 2 of GB16889-2024.

Landfill Leachate Characteristics

  • Complex, high-concentration organic wastewater
  • High pollutant concentration and large fluctuations in water quality and flow
  • High ammonia-nitrogen concentration
  • Imbalanced nutrient ratios
  • Presence of heavy metals and toxic substances
  • Water-quality characteristics change significantly with landfill age

Treatment Targets

  • Treat 150 t/d of landfill leachate
  • Meet Table 2 requirements of the Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2024) after treatment

Engineering Focus

  • Designed for highly concentrated and highly variable landfill leachate
  • Treatment target is tied to the current GB16889-2024 Table 2 discharge requirement
  • Project conditions account for leachate characteristics that change with landfill age

Compliance Standard

  • Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2024), Table 2.
Ningling Landfill Leachate Treatment Project site photo 1
Ningling Landfill Leachate Treatment Project site photo 2
Ningling Landfill Leachate Treatment Project site photo 3

Tell us your water quality, flow rate and reuse target.

Our team can help evaluate membrane process selection, system configuration, retrofit requirements and project implementation for industrial wastewater treatment and reclaimed-water reuse.

DISCUSS YOUR PROJECT